Qualified DSM/EE Generation Facilities Summary




Facility Info

17 items found, displaying all items.1
In PA Alternative Fuel Certification [1] EIA-860 Plant Name Fuel Types at Facility Total Nameplate Capacity [2] Certification Start RTO
* PA-39094-EE-II, PA-39095-DSR-II Clairton Works (p) (US Steel Mon Valley Works Energy Efficiency, Demand Side Response * can't be determined 05/04/2006
* PA-39084-EE-II Conservation Consultants, Inc. Energy Efficiency * can't be determined 01/25/2006 PJM
* PA-39085-EE-II Energy Coordinating Agency Energy Efficiency * can't be determined 01/25/2006 PJM
PA-46034-DSR-II Covington Facility Demand Side Response 96.5 01/31/2006 PJM
* PA-39092-EE-II, PA-39093-DSR-II Edgar Thompson Plant GEN 1 p(U.S. Steel Mon Valley Works Energy Efficiency, Demand Side Response * can't be determined 05/04/2006
* PA-39092-EE-II, PA-39093-DSR-II Edgar Thompson Plant GEN 2 p(U.S. Steel Mon Valley Works Energy Efficiency, Demand Side Response * can't be determined 05/04/2006
* PA-39092-EE-II, PA-39093-DSR-II Edgar Thompson Plant GEN 3 p(U.S. Steel Mon Valley Works Energy Efficiency, Demand Side Response * can't be determined 05/04/2006
* PA-39185-DSM-II Project Barbados Demand Side Response * can't be determined 06/01/2009 PJM
* PA-39131-DGN-II Duquesne Univ. CHP Energy Efficiency * can't be determined 11/01/2008 PJM
* PA-39139-EE-II Balitzky Energy Efficiency * can't be determined 01/12/2009 PJM
PA-32026-EE-II R&R Trenton Energy Efficiency * can't be determined 03/25/2009 PJM
PA-32023-EE-II Trump Plaza Energy Efficiency * can't be determined 03/25/2009 PJM
PA-32024-EE-II Trump Taj Mahal Energy Efficiency * can't be determined 03/25/2009 PJM
PA-32025-EE-II Walmart Cpower Energy Efficiency * can't be determined 03/25/2009 PJM
PA-46054-EE-II Boudouris Hot Water Energy Efficiency * can't be determined 10/01/2009 PJM
PA-46078-EE-II Read Thermal Energy Efficiency 0.0024 03/03/2010 PJM
PA-46109-EE-II Studt Thermal Energy Efficiency 3.5 04/29/2010 PJM

 

Footnotes:

  1. Certification numbers contain the renewable fuel type the facility was certified for. Please refer to the list of abbreviations to determine the qualifying fuel(s) for the plant
  2. The Nameplate Capacity includes the capacity of the entire plant and may or may not be indicative of the capacity that is renewable. This is especially true for multi-fuel facilities as the fuel mix may change on a regular basis.
  3. A second certification date shown for a single system may be indicative of a system expansion or a secondary certification. Please contact the program administrator with specific questions regarding a certification date