Qualified DSM/EE Generation Facilities Summary


      Search For      

Facility Info

16 items found, displaying all items.1
In PA Alternative Fuel Certification [1] EIA-860 Plant Name Fuel Types at Facility Total Nameplate Capacity [2] Certification Start RTO
* PA-393030-EE-II ATAS International Energy Efficiency * can't be determined 2010-09-16 PJM
* PA-393029-EE-II comfort-geothermal Energy Efficiency * can't be determined 2010-08-09 PJM
PA-46109-EE-II Studt Thermal Energy Efficiency 3.5 2010-04-29 PJM
PA-46078-EE-II Read Thermal Energy Efficiency 0.0024 2010-03-03 PJM
PA-46054-EE-II Boudouris Hot Water Energy Efficiency * can't be determined 2009-10-01 PJM
* PA-32025-EE-II Walmart Cpower Energy Efficiency * can't be determined 2009-03-25 PJM
PA-32024-EE-II Trump Taj Mahal Energy Efficiency * can't be determined 2009-03-25 PJM
* PA-39085-EE-II Energy Coordinating Agency Energy Efficiency * can't be determined 2006-01-25 PJM
* PA-39084-EE-II Conservation Consultants, Inc. Energy Efficiency * can't be determined 2006-01-25 PJM
PA-32023-EE-II Trump Plaza Energy Efficiency * can't be determined 2009-03-25 PJM
PA-32026-EE-II R&R Trenton Energy Efficiency * can't be determined 2009-03-25 PJM
* PA-39139-EE-II Balitzky Energy Efficiency * can't be determined 2009-01-12 PJM
* PA-39092-EE-II, PA-39093-DSR-II Edgar Thompson Plant GEN 3 p(U.S. Steel Mon Valley Works Energy Efficiency, Demand Side Response * can't be determined 2006-05-04
* PA-39092-EE-II, PA-39093-DSR-II Edgar Thompson Plant GEN 2 p(U.S. Steel Mon Valley Works Energy Efficiency, Demand Side Response * can't be determined 2006-05-04
* PA-39094-EE-II, PA-39095-DSR-II Clairton Works (p) (US Steel Mon Valley Works Energy Efficiency, Demand Side Response * can't be determined 2006-05-04
* PA-39092-EE-II, PA-39093-DSR-II Edgar Thompson Plant GEN 1 p(U.S. Steel Mon Valley Works Energy Efficiency, Demand Side Response * can't be determined 2006-05-04

 

Footnotes:

  1. Certification numbers contain the renewable fuel type the facility was certified for. Please refer to the list of abbreviations to determine the qualifying fuel(s) for the plant
  2. The Nameplate Capacity includes the capacity of the entire plant and may or may not be indicative of the capacity that is renewable. This is especially true for multi-fuel facilities as the fuel mix may change on a regular basis.
  3. A second certification date shown for a single system may be indicative of a system expansion or a secondary certification. Please contact the program administrator with specific questions regarding a certification date